![]() The the maximum number of cores to use expressed as a percent of total CPU cores. If there is an error, the job data is provided here so you can determine which job caused the error. When a job is completed, the JobCompleted event is called passing along the results returned from JobRun. If you have large data (pictures, data, databases, etc.) then pass along information on how to get the data using other means such as file access or connecting to the database and fetching what is needed. You should avoid passing around large chunks of data as that will not be memory efficient. This information is supplied as the parameter to JobRun. Return something that indicates the job to process. 3.1 Excluding Project Items From Worker HelpersĬalled when JobRun completes and contains the results returned by JobRun.Ĭalled by SendProgress() method to provide information about the progress of the job.
0 Comments
Leave a Reply. |